Ford Mobile Charging Station
480V battery charger substation. Location Mobile – Dearborn, MI Challenge To construct a substation modular system to work around the other demo and construction going on in the location. Solution ⦁ Design and engineered a 2-section enclosure for rapid deployment. ⦁ All level 1 and 2 commissions were done in the manufacturing facility prior to […]
GM Yuma
Battery Charging Sub Station. Location GM Proving Grounds – Yuma, Arizona Challenge Complete the substation 4 weeks after gear arrival. The electrical equipment was delayed in manufacturing by the gear manufacturer, and the general contractor needed to turn the project over to GM within 6 weeks of receiving gear. Solution ⦁ Flex Air designed and […]
Ford Boiler
300 Horsepower steam boiler plant for automotive manufacturer application. Location Windsor, Canada Challenge The company needed a vendor to expedite delivery and install of a new boiler plant to replace the aging infrastructure. The entire project timeline was accelerated. Solution ⦁ Flex Air was contracted to finish/complete the design of the steam plant and source […]
GM Ultium
Medium Voltage Switch House. Location GM – Lordstown, Ohio Challenge Construction Schedule Constraints. Solution ⦁ Flex Air designed and built a modular switch house to go in place of the standard pre-engineered building. ⦁ Deployed a 4,956 sq. – 14 section modular building containing 3 medium voltage gear line ups. ⦁ Completed with tie buss, […]
UD Worrilow
Two (2) 30,000 CFM AHU with thermal break construction. Location University of Delaware Challenge Aggressive lead time with high-end performance. A design challenge for high-end laboratory-type applications. Solution ⦁ Worked within design constraints. ⦁ Flex Air manufactured unit to prevent exterior condensation. ⦁ Delivering tight tolerance on humidity and filtration/air quality. ⦁ Including energy recovery.
IPS Sofie
A 2700 sqft. custom mechanical platform and penthouse with an integrated chilled water system, hot water system, compressed air, steam, general and lab air handlers. Location Totowa, New Jersey Challenge Integrate all systems (mechanical) with limited interference to the building. Solution ⦁ Fully integrated. ⦁ Complete offsite build which allowed for reduced onsite labor and […]
GE Aerospace
Package custom AHU with integrated desiccant de-humification. Location Mishawaka, New York Solution ⦁ One (1) 18,000 CFM, HVAC unit for paint process application with integrated desiccant dehumidification. ⦁ AHU and vestibule all in one. ⦁ All mechanical and electrical was pre-piped and wired for a turnkey mechanical solution.
Ford MAP
13Kva double-ended substation. Location Michigan Assembly Plant – Wayne, MI Challenge Cost and speed to deployment, and site constraints. Solution ⦁ Designed and engineered a modular substation ⦁ Installed standard cable tray for wiring of all skid-mounted equipment (equipment provided by the client, assembled in the Flex Air plant)
WVU Ruby
A 30,000 CFM hospital-grade, rooftop AHU. Location West Virginia University Challenge The hospital was looking to replace operating room AHU with little downtime. Solution ⦁ Flex Air developed AHU custom shipping splits. ⦁ Custom down length of AHU so install could be moved via freight elevators. ⦁ Complete assembly (did not have to build on-site) […]
Allegheny Health
A 42,500 CFM hospital-grade AHU matching the architectural building siding. Location Jefferson Hills, PA Challenge Design and Build a custom AHU for exterior design to blend with the existing building. Solution ⦁ Standard construct design allowed for any number of architect siding to be factory mounted with minimal cost or lead time impact. ⦁ Custom […]