Description
A total of 3.3 Million CFM – (53) AHU for a large-scale new paint shop building. Designing efficient and effective filtering and conditioning for paint process.
Location
Detroit
Challenge
Size and scope of the project with an aggressive project schedule.
Solution
⦁ Design and deliver AHU for the first large-scale paint shop.
⦁ Worked closely with paint shop engineering team to make sure that design was approved to meet the job site schedule.
⦁ Developed filtering, conditioning, and humidification for an ideal paint shop process.