Description
Two (2) 30,000 CFM AHU with thermal break construction.
Location
University of Delaware
Challenge
Aggressive lead time with high-end performance. A design challenge for high-end laboratory-type applications.
Solution
⦁ Worked within design constraints.
⦁ Flex Air manufactured unit to prevent exterior condensation.
⦁ Delivering tight tolerance on humidity and filtration/air quality.
⦁ Including energy recovery.