Description
A 30,000 CFM hospital-grade, rooftop AHU.
Location
West Virginia University
Challenge
The hospital was looking to replace operating room AHU with little downtime.
Solution
⦁ Flex Air developed AHU custom shipping splits.
⦁ Custom down length of AHU so install could be moved via freight elevators.
⦁ Complete assembly (did not have to build on-site) within 24 hours from demo to new install.