KCAP Substation
10,000 KVA (5.6 MW) Substation consisting of three substations plus a sparing substation. Location Kansas City, MO Challenge This substation had to be completed quickly and efficiently. An off-site manufacturing solution was decided upon in order to decrease project timelines. Solution ⦁ Flex Air completed this project Off-site while helping with the installation process on […]
Ford Mobile Charging Station
480V battery charger substation. Location Mobile – Dearborn, MI Challenge To construct a substation modular system to work around the other demo and construction going on in the location. Solution ⦁ Design and engineered a 2-section enclosure for rapid deployment. ⦁ All level 1 and 2 commissions were done in the manufacturing facility prior to […]
GM Yuma
Battery Charging Sub Station. Location GM Proving Grounds – Yuma, Arizona Challenge Complete the substation 4 weeks after gear arrival. The electrical equipment was delayed in manufacturing by the gear manufacturer, and the general contractor needed to turn the project over to GM within 6 weeks of receiving gear. Solution ⦁ Flex Air designed and […]
GM Ultium
Medium Voltage Switch House. Location GM – Lordstown, Ohio Challenge Construction Schedule Constraints. Solution ⦁ Flex Air designed and built a modular switch house to go in place of the standard pre-engineered building. ⦁ Deployed a 4,956 sq. – 14 section modular building containing 3 medium voltage gear line ups. ⦁ Completed with tie buss, […]
GE Aerospace
Package custom AHU with integrated desiccant de-humification. Location Mishawaka, New York Solution ⦁ One (1) 18,000 CFM, HVAC unit for paint process application with integrated desiccant dehumidification. ⦁ AHU and vestibule all in one. ⦁ All mechanical and electrical was pre-piped and wired for a turnkey mechanical solution.
Ford MAP
13Kva double-ended substation. Location Michigan Assembly Plant – Wayne, MI Challenge Cost and speed to deployment, and site constraints. Solution ⦁ Designed and engineered a modular substation ⦁ Installed standard cable tray for wiring of all skid-mounted equipment (equipment provided by the client, assembled in the Flex Air plant)